Custom mounting of printed circuit boards
Advantages of our service
- Top equipment for accurate and reliable fitting
- Flexibility in prototyping and middle-series production
- Fast delivery times and express processing
- Comprehensive testing and quality control
- Professional customer support
PCB assembly – assembly variants
PROTOTYPE or STANDARD:
- Applying solder paste or glue - Jet Printer, automatic stencil printing, manual dispensing
- SMT assembly - SMT assembly machines or by hand
- Soldering - reflow, wave, rework station, hot-air
- Inspection - optical and electrical (partial or complete functional testing)
- Cleaning - manual IPA or ultrasonic cleaning
- Division/cutting - in a panel or to individual pieces (cutting, grinding)
Table of express surcharges of PCB assembly in the PROTOTYPE category:
Working Days | 1* | 2 | 3 | 4 | 5 - 8 |
Express Surcharge (%) | 300 | 150 | 80 | 30 | 0 |
* available only after a previous agreement, according to specification
The PROTOTYPE category includes all orders that meet the following conditions:
- maximally 100 component types per board type
- maximally 5000 installed SMD components in one order
- maximum 1000 soldered pins for TH components
- material supplied by the customer must meet the criteria for machine fitting /link/ (reels, stripes, tube - not loose parts or scraps without sufficient reserve)
- date for assembly starts the day after the completion of all material (plates, components, templates)
Table of express surcharges of PCB assembly in the STANDARD category:
Working Days | 1* | 2* | 3* | 4 | 5 | 6 | 7 | 8 - 10 |
Express Surcharge (%) | 400 | 200 | 100 | 80 | 60 | 40 | 25 | 0 |
* available only after a previous agreement, according to specification
The STANDARD category includes orders of the following type:
- more than 100 types of components per board type
- 5,000 - 50,000 assembled SMD components per order
- 1000 - 10,000 soldered pins for TH components
- material supplied by the customer must meet the criteria for machine fitting /link/ (reels, stripes, tube - not loose parts or scraps without sufficient reserve)
- date for assembly starts the day after the completion of all material (plates, components, templates)
- Four SMT Assembly Machines MYcronic MY200, MY100, MY15, MY100-10, MY15
- Jet Printer Mycronic MY600 and MY500
- Two Stencil Printing DEK and ASV
- Reflow Soldering Oven SEHO GoReflow 2.3 and SMT Quattro Peak M (N2)
- Optical Testing FAI Quins LC-20, 3D AOI SAKI 3Di-LS2A
- Selective Soldering InterSelect IS-B-335 S
- Full Functional Testing
- Rework Station Array Package Rework System APR-5000-DZ
- Two Material Storage Mycronic SMD Tower 200
- Two Soldering Wave Seho System 8140 PCS
- Two ESD MP DRY CABINET
- Leaded and Lead-free Options
- IC programming
- Scienscope AXC-800 III X-Ray Component Counter and Sciencecope X-Scope 3000